|
Monday, February 8, 2010
|
The Contractor shall furnish all plant, materials, labor, services, equipment, supervision, and performance necessary for construction of roadway including grade, drain, remove and dispose of existing bituminous pavement; construct sidewalk, curb and cutter; and place aggregate base course, hot asphalt concrete pavement and pavement markings for 0.989 miles on BIA Route 4.
|
*
|
2:00 PM
|
FAIR 4(2) Roads Construction Project RA001110005
|
Whiteriver
|
AZ |
This project is a new 6,218 square foot Veterinarian Hospital Building.
|
*
*
|
2:00 PM
|
SILVERBELL ANIMAL CARE CENTER
|
Marana
|
AZ |
|
Tuesday, February 9, 2010
|
Prebid Conference will be held on January 6, 2010 at 11:00 a.m. A site visit will be held on January 14, 2010 at 8:00 a.m. The work consists of the construction of approximately a 12,067 square foot, single story, three bay fire station housing fire department personnel and related emergency vehicles and equipment.
|
*
*
*
|
2:00 PM
|
601820 Fire Station No. 22 CL-2010-91
|
Las Vegas
|
NV |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $160,000
Architect: Mark Reiske-University of Kansas 785-864-5644
|
*
*
*
|
2:00 PM
|
A-011173 Robinson Center Tuckpointing, Cleaning and Sealing
|
Lawrence
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $48,600
Architect: Kevin Morgan 785-296-4489
|
*
*
*
|
2:00 PM
|
A-011312 Wichita Work Release Facility - Partial TPO Reroof
|
Wichita
|
KS |
Scope of work: Bridge Joint Rehabilitations work will include Strip Seal; Joint Armor; Modular Joint; and various other miscellaneous items. A pre-bid conference for this project will be held on Wednesday, JANUARY 27th, 2010, at 2:00 p.m.
|
*
*
*
|
2:00 PM
|
Bridge Joint Rehabilitations ARRA ST85110078-1010
|
Phoenix
|
AZ |
The Owner extends an invitation to all qualified construction manager firms to submit their qualifications and experience to provide Construction Manager at Risk Services and Construction of the 2010 SUMMER IMPROVEMENTS project. A pre-submittal conference is scheduled on February 2, 2010 at 2:00 p.m.
|
*
|
2:00 PM
|
CM at RISK 2010 SUMMER IMPROVEMENTS RFQ 10-001
|
Phoenix
|
AZ |
A Pre-Bid Conference will be held on Tuesday, February 2, 2010 at 10:30 AM, Local Time at the Window Rock Unified School District Administration Building. The Owner is requesting competitive sealed bids for the construction of NEW TEACHER HOUSING MOBILE HOME SITES.
|
*
*
*
|
2:00 PM
|
NEW TEACHER HOUSING MOBILE HOME SITES
|
Fort Defiance
|
AZ |
It is the intent of the Owner to select a contractor for the renovation, remodeling and repairs to the Performing Arts Center. Work will include normal and typical finishes, structure, interior construction and mechanical, plumbing and eletrical system work to (a) remove existing storage deck and offices, then construct a new structural storage deck, offices beneath and adjacent improvements in the scene shop; (b) renovate staff office space and construct a new data room; (c) demolish existing and construct new dressing rooms and public restrooms; (d) construct a new public lobby and east entrance; (e) remodel and provide improvements in the existng lobby including office, storage room and guest services area; (f) remodel and provide improvements in the theater house and stage area including modifying entries, general lighting, seating, audio and lighting control stations, replacing stage covering, theater rigging and lighting.
|
*
*
|
2:30 PM
|
SCC PERFORMING ARTS CENTER RENOVATION, REMODELING & REPAIRS IFB 2957-7
|
Scottsdale
|
AZ |
There will be a Pre-Offer Conference on Friday, January 29, 2010 at 10:00 am. Tower Replacements.
|
*
*
|
3:00 PM
|
ADSPO10-00000037 Cooling Tower Replacements
|
Phoenix
|
AZ |
Sitework of an existing campus. Scope includes but is not limited to: Concrete, Surveying, Materials Testing, Grading, Landscape & Irrigation, Masonry, Steel Trash Gates, General Sheet Metal and Electrical.
|
*
*
|
3:30 PM
|
SCC East Fire Lane to Baseball Sidewalk Addition
|
Scottsdale
|
AZ |
Pre-bid conference is scheduled for Thursday, January 28, 2010 at 9:00 A.M. Local AZ Time. Chiller Replacement.
|
*
*
|
4:00 PM
|
100376 Tower Fill and Chiller Replacement
|
Tucson
|
AZ |
|
Wednesday, February 10, 2010
|
Laboratory Demolition.
|
*
*
*
|
3:00 PM
|
ADSPO10-00000036 Laboratory Demolition
|
Tucson
|
AZ |
On-site meeting; see special terms and conditions, for Well Maintenance.
|
*
|
3:00 PM
|
DC100197 Water Well Maintenance
|
Florence, Picacho, Buckeye, Wilcox, Tucson, St. Johns and San Luis
|
AZ |
NOTICE IS HEREBY GIVEN that sealed bids will be received by the Owner to provide LED Roadway Lighting Luminaires & Installation. This Request for Bids is for a three (3) year term contract for the purchase of LED Roadway Lighting Luminaires & Installation for the Transportation Department Field Operations Division to replace approximately 2000 luminaires with Solid State LED Roadway Luminaires or approved equal to be determined by Street Light Supervisor.
|
*
|
3:00 PM
|
LED ROADWAY LIGHTING LUMINAIRES & INSTALLATION 2010113
|
|
AZ |
This project involves providing improvements for an existing wastewater treatment plant. Improvements include; pumps and electrical added two head works, effluent force main, storage tanks, irrigation type flow splitter boxes, approximately two acres of subterranean irrigation field. Additional scope items may be added for noise and odor mitigation.
|
*
*
|
4:00 PM
|
Pioneer WWTP Improvements
|
Maricopa County
|
AZ |
|
Thursday, February 11, 2010
|
Pre-bid meeting and work-site walk through will be held on-site January 7, 2010 at 10:00am. Scope will include Electrical, Mechanical and Pneumatic installation work as necessary to prepare the lower level maintenance service bays for operational status as described in the IFB
|
*
*
*
|
12:00 PM
|
10-10010-S Maintenance Facility Lower Level Service Bay Preparation
|
Mesa
|
AZ |
The Owner is seeking qualified Job Order Contractors to do business on an “on-call” basis. This Job Order Contract (JOC) is for Bridge and Dam Safety Repair, as included in the Call for Qualifications (CFQ) for this project. A pre-submittal conference for this project will be held on Thursday, January 28, 2010 at 1:30 p.m., local time.
|
*
*
|
1:00 PM
|
Bridge and Dam Safety Repair JOC Program 4108JOC083-1010
|
Phoenix
|
AZ |
NOTICE IS HEREBY GIVEN that the Owner will receive sealed bids for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Removal of existing irrigation pump, electrical panel, and associated irrigation equipment, and installation of a new pump system, electrical service, overhead canopy and restorative work to the wet well and intake, new mainline and lateral piping, valves, quick couplers, heads (to include drip system), wiring, controllers, etc. All work shall comply with the design intent as shown on the Approved Drawings and Specifications.
|
*
*
|
1:00 PM
|
DOBSON PARK SPRINKLER UPGRADES PROJECT 07-006-001
|
Mesa
|
AZ |
A Pre-bid Conference will be held at 1:30 P.M., January 28, 2010. Notice is hereby given that the Owner will receive sealed Bids for the Pascua Yaqui Multipurpose Justice Center.
|
*
*
|
1:30 PM
|
MULTIPURPOSE JUSTICE CENTER
|
Tucson
|
AZ |
NOTICE IS HEREBY GIVEN that sealed bids will be received by the Owner for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Furnish and install new service entrance sections, conduits, wires, breakers, and disconnects as shown or specified. Remove, relocate, and install all specified existing equipment. Coordinate outages with City and SRP. Provide all other materials and installation required in the approved plans and specifications.
|
*
*
|
1:30 PM
|
Riverview Park Electric Service Replacement PROJECT 09-916-001
|
Mesa
|
AZ |
This project consists of a base bid of approximately 138,025 square yards of fog seal, and three (3) additive alternates.
|
*
*
|
1:30 PM
|
SM312C-2 Fog Seal Program, Phase II
|
Lake Havasu City
|
AZ |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $180,000
Architect: Mark Reiske., University of Kansas
785-864-5644
|
*
*
*
|
2:00 PM
|
A-010856 Strong Hall West Wing Reroof and Parapet Repair
|
Lawrence
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget:$1,100,000
Engineer: W. Gary Mohr, Professional Engineering Constultants - 785-842-6464, gary.mohr@pec1.com
|
*
*
*
|
2:00 PM
|
A-011059 Utility Tunnel Deferred Maintenance - Phase III
|
Lawrence
|
KS |
Major Work Items Include: Installation of approximately 6300 linear feet of new 8" sewer line and approximately 1400 linear feet of 12" waterline and abandon lift station #10. Work includes pavement replacement, landscaping and CIPP lining.
|
*
*
*
|
2:00 PM
|
HAPPY VALLEY & HAYDEN SEWER CONNECTIONS 10PB032
|
|
AZ |
It is the Owners intent to award a fixed price contract for Roads Construction Project HIR 2(11). The Contractor shall furnish all plant, materials, labor, services, equipment, supervision, and performance necessary for construction of roadway including repair, mill, grade subsurface, place AB leveling course, place AC, asphalt-rubber membrane, and chip-seal coat on IR 2 / Leupp Road on the Hopi Indian Reservation. Bidders must have and maintain "active" Contral Contractor Registration (CCR) in order to receive award from the Federal Government. To register or to learn more about the CCR, go to www.ccr.gov.
|
*
|
2:00 PM
|
Roads Construciton HIR 2(11) Solicitation RA001110015
|
|
AZ |
The purpose of this Request for Proposal (RFP) is to enter into a long-term contract and secure pricing with a qualified vendor (a third party power provider) to provide a privately-owned solar photovoltaic (PV) energy system and sell the electricity output to the District. The PV system is anticipated to be between 2 MW and 5 MW of DC output and the systems will likely be built over a period of the next two years.
|
*
*
|
2:30 PM
|
Solar Photovoltaic Electric Generating System RFP 09-048
|
Phoenix
|
AZ |
The Owner is accepting sealed bids for the Paving, Sidewalk and Water Line Improvement Work on various streets. The Owner is seeking a qualified licensed, bonded and insured contractor to furnish specified materials, labor, equipment and related items for the installation of new 8-inch water main and the street improvement work including sidewalk and street reconstruction.
|
*
*
|
3:00 PM
|
CDBG Streets, Sidewalks, and Waterline Improvements 10-041.2
|
Avondale
|
AZ |
Pre-bid Conference held December 3, 2009 at 1:30 P.M. The Owner requests interested parties to submit proposals for Central Mesa Light Rail Extension Engineering Services.
|
*
*
|
3:00 PM
|
LRT-10-141rfq LIGHT RAIL EXTENSION ENGINEERING SERVICES
|
to an end of line station on Main Street between Lesueur and Hobson.
|
AZ |
|
Friday, February 12, 2010
|
Proposed multi-use pathway and bridge project.
ADOT will only accept bids from prequalified contractors purchasing bid documents directly from ADOT.
|
*
*
|
11:00 AM
|
SS59101C CAPACITY ADDITIONS
|
GLENDALE
|
AZ |
The work consists of milling of asphaltic concrete pavement, overlaying with asphaltic rubber concrete surface course, installing video detection camera systems, resetting frames and covers for manholes, valve boxes and survey monument, applying pavement marking and performing other related work.
ADOT will only accept bids from prequalified contractors purchasing bid documents directly from ADOT.
|
*
*
|
11:00 AM
|
SS78801C RESTORATION/REHAB/RESURFACE
|
Gilbert
|
AZ |
A pre-submittal conference will be held on Friday, January 29, 2010, at 9:00 A.M., local time. is seeking qualified consultants to provide engineering/consulting on-call services citywide on an as-needed basis from July 1, 2010 through June 30, 2012. The City will retain the engineers for a two-year contract term. Up to 60 firms will be selected. Interested firms may submit on any or all of the services listed below for the Engineering/Consulting On-Call Services contracts. This solicitation is open to all firms.
|
*
|
12:00 PM
|
Engineering/Consulting On-Call Services 2010-2012 EASOCS1112-1010
|
Phoenix
|
AZ |
Sealed Bids will be received by the Owner to do the work required for the Project known as Cienega High School Greenhouse.
|
*
*
|
2:00 PM
|
Cienega High School Greenhouse IFB C10-02-11
|
Vail
|
AZ |
A Pre-bid Conference will be held on January 14, 2010 at 9:30 a.m. The work consists of the construction of approximately a 23,566 square foot, single story facility housing.
|
*
*
*
|
2:00 PM
|
CL-2010-121 Metro Substation 601817
|
Las Vegas
|
NV |
The Owner is hereby issuing a Request for Qualifications (RFQ) to build a splash park facility at the Pop Harvey Park (the “Project”). The selected contractor will provide design-build services for the Project. Geotechnical investigation and surveys as required by the Project will be included and performed as part of the construction services.
|
*
*
|
4:00 PM
|
Parker Splash Park RFQ
|
Parker
|
AZ |
The Owner invites interested and qualified Construction
Firms and/or Teams to submit a written Statement of Qualifications to provide Construction Manager at Risk Services relating to the new Experimental Hillslope Project at Biosphere 2. This project will provide three Experimental Hillslopes, each approximately 35'-0" x 105'-0", sloped at 10-degrees, constructed within the enclosure of Biosphere 2. The installation will include the structural system, a deck with a chemically-inert liner, one-meter of
precisely-engineered soil, load cells, an irrigation system, a drainage water collection and sampling system, an access system capable of positioning staff over the Hillslopes, associated electrical elements, and a controls package. A mandatory Pre-Submittal Conference will be held at 2:30 pm local Tucson time on Tuesday February 2, 2010.
|
*
*
|
5:00 PM
|
Experimental Hillslope Project 09-8917
|
Tucson
|
AZ |
|
Monday, February 15, 2010
|
TENANT IMPROVEMENT (19,990 S.F.).
|
*
*
|
12:00 PM
|
99 CENT ONLY STORE TENANT IMPROVEMENT
|
Tucson
|
AZ |
The Owner intends to make a single award to a qualified small business for the provision of installing a 1500 DQGAB Cummins/Onan Diesel Generator Set.
|
*
*
*
|
2:00 PM
|
RFPP0609028 Install New Emergency Generator Set
|
Safford
|
AZ |
|
Tuesday, February 16, 2010
|
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $400,000
Engineer: Jeff Romine, Brack & Associates Consulting Engineers, P.A. 785-271-6644, jdromine@brackengin.com
|
*
*
*
|
2:00 PM
|
A-011190 Science Hall - Breukelman Fume Hoods
|
Emporia
|
KS |
1) General site work, pathway, utilities, landscaping, and amenities 2) New Education/Multi-Purpose facility and elevated entry walk..
|
*
|
2:00 PM
|
L10PS01720 MOJAVE DISCOVERY CENTER
|
|
NV |
Construction of approximately 1,321 linear feet of 8 inch water mains.
|
*
*
*
|
3:00 PM
|
Sanitary Sewer and Water Improvements 09-053
|
Kingman
|
AZ |
The Owner is seeking a qualified Engineering Consultant to provide engineering design, study, construction administration, and limited construction observation services related to a new potable waterline located along the eastern edge of the New River.
|
*
|
4:00 PM
|
NEW RIVER WATERLINE PROJECT # 091028
|
|
AZ |
|
Wednesday, February 17, 2010
|
Working Days: 10 KDOT Construction Office: OLATHE
Starting Dates - Earliest: NOVEMBER 15, 2010 Latest: NOVEMBER 29, 2010
Project Ties: 510022111 KA 0005-01
I070-089 KA 0005-02 /ARRA-0705(215
Interchange in Shawnee County
State tied with I435-046 K 0005-01
|
*
|
1:00 PM
|
SEEDING, STATE TIE: I070-089 KA 0005-02
|
Shawnee County
|
KS |
GRADING, BRIDGE & SURFACING. LOCATION IS BR.25, 110 MILES
CR DRG, 0.44 MILE WEST OF JCT US-75 IN OSAGE COUNTY. NET
LENGTH IS 0.025 miles
|
*
*
|
1:00 PM
|
GRADING, BRIDGE & SURFACING
|
Kansas
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $165,000.00
Architect: Dan Prosser 785-272-8681
dprosser@kshs.org
|
*
*
*
|
2:00 PM
|
A-010840Reb Pawnee Rock State Historic Site Restoration and Site Improvements
|
Pawnee Rock
|
KS |
NOTICE TO CONTRACTORS and CONTRACT PROPOSAL
1. The Secretary of Transportation of the State of Kansas [Secretary] will
receive sealed proposals from prequalified contractors for construction,
improvement, reconstruction, or maintenance work in the State of Kansas,
said work known as Project No. U024-023 KA 0389-01 BRF-A038(901)
[Project]. The general scope of the project is:
GRADING AND BRIDGE. LOCATION IS US-24; 2.32 MI E OF US-59
S JCT OVER MUD CREEK IN DOUGLAS COUNTY. NET LENGTH IS 0.245
MILES.
|
*
*
|
2:00 PM
|
U024-023 KA 0389-01 /BRF-A038(901) Bridge
|
Douglas County
|
KS |
Pre-offer conference scheduled February 3, 2010 at 10:00 a.m. Exterior Painting.
|
*
|
3:00 PM
|
VSP10-173 Exterior Painting
|
Phoenix
|
AZ |
A RECOMMENDED Pre-Submittal Conference is scheduled for 10:00 A.M, MST, Monday, February 8, 2010. The Owner extends an invitation to interested and qualified firms or individuals to submit formal sealed qualifications to provide Construction Manager at Risk design phase services and construction phase services as described herein.
|
*
|
3:00 PM
|
W.P. CAREY SCHOOL OF BUSINESS NEW BUILDING RFQ CMAR 2008-16503
|
Tempe
|
AZ |
|
Thursday, February 18, 2010
|
The Owner hereby solicits SEALED Statement of Qualifications(SOQs) from engineering/architectural firms to develop the plans, specifications and bid documents for the reconstruction of approximately one-half mile of Coolidge Avenue from State Route 87/287 (Arizona Blvd) to 1st Street. This project will utilize both Federal and City funds. Firms must be ADOT pre-qualified before submitting SOQ’s.
|
*
|
10:00 AM
|
ENGINEERING QUALIFICATIONS – COOLIDGE AVE RFQ
|
|
AZ |
Consists of the remodel of an existing 114,399 SF Sam's Club.
|
*
|
12:00 PM
|
Sam's Club Remodel 6632
|
Denver
|
CO |
A pre-submittal conference for this project will be held on Tuesday, February 9, 2010at 9:00 a.m., local time. The Owner is seeking a qualified Job Order Contractor to do business with the City of Phoenix on an “On-Call” basis. The scope of this Job Order Contract (JOC) includes, but not limited to the services below: Fire Hydrant Replacement Construction including Relocations; Repair and /or Replacement of Valve, Box, and Cover; Furnish and Installation of Restrained Ductile Iron Pipe and Fittings; Installation and Testing of City Supplied Fire Hydrants; Removal and Salvage of Damaged Fire Hydrants; Restore Existing Landscaping and Irrigation Systems; Removal and Replacement of Existing Concrete Curb and Gutter, Sidewalk and Driveways; Permanent and Temporary Asphalt Concrete Pavement Replacement.
|
*
|
1:00 PM
|
Annual Fire Hydrant Replacement JOC 4108JOC068-120
|
|
AZ |
Pre-bid meeting is scheduled on February 4, 2010 at 2:30 PM Local Tucson Time. The project consists of milling and removing asphalt ...
|
*
|
2:00 PM
|
1000742 ARRA Pavement Preservation - Segment 17
|
Tucson
|
AZ |
Pre-bid meeting is scheduled on February 4, 2010 at 3:00 PM Local Tucson Time. The work also includes the replacement of bridge expansion joints and asphaltic .....
|
*
*
|
2:00 PM
|
1001197 Deck Rehabilitation (4RTSCB)
|
Tucson
|
AZ |
A Pre-bid Conference will be held on January 6, 2010 at 12:00 p.m. The Project work scope includes all material, labor, and equipment necessary as well as the construction of a new restroom.
|
*
*
*
|
2:00 PM
|
601826 Metro Firearms Range CL-2010-125
|
Las Vegas
|
NV |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $2,785,000
Engineer: Sean Miller, MKEC Engineering Consultants, Inc.
316-684-9600, smiller@mkec.com
|
*
*
*
|
2:00 PM
|
A-010718 Duerksen Fine Arts Center HVAC System Replacement - Phase I
|
Wichita
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $2,300,000
Engineer: Michael Wagner, P.E Smith & Boucher
913-345-2127 mwagner@smithboucher.com
|
*
*
*
|
2:00 PM
|
A-010737Rev Steam Distribution Piping Replacement
|
Manhattan
|
KS |
A Mandatory Pre-Bid Conference will be held at 9:00 A.M., Local Time, January 20, 2010. Sealed bids will be received by the Owner for Construction of two new 11,000 square foot Fire Stations #1 and #8.
|
*
*
|
2:00 PM
|
CONSTRUCTION OF FIRE STATIONS 1 and 8, 10PB051
|
Scottsdale
|
AZ |
The Owner requests competitive sealed bids from qualified firms furnishing all labor, materials, and equipment for Project.
|
*
|
2:00 PM
|
PW-1027 - FY09/10 Annual Street Maintenance-SAMS
|
Sierra Vista
|
AZ |
Pre-bid Meeting is scheduled on Monday February 8, 9:00 AM. Work includes pulling/installing pumping system.
|
*
|
3:00 PM
|
2010-001 Well Repair Services
|
Town of Marana
|
AZ |
The Owner invites interested Contractors to submit a written Statement of Qualifications (SOQ) for performing Construction Manager At Risk (CM@R) services relating to the design review, value engineering and construction of the Cherry Avenue Storm Drain Improvements Project. To be eligible for consideration, Contractors must submit an SOQ demonstrating appropriate competence, qualifications, and relevant construction experience with these types of projects. A pre-submittal meeting will be held at 1: 00 P.M. February 9, 2010.
|
*
|
3:00 PM
|
Cherry Avenue Storm Drain Improvements - CM@R Services
|
|
AZ |
The Owner is seeking bids for removal and
replacement of the District Office Computer Room Air Conditioning. A Mandatory Pre-Bid Conference will be on: February 4, 2010 at 10:00 AM.
|
*
*
|
3:00 PM
|
District Office Computer Room AC Unit Replacement B10/9706
|
Tucson
|
AZ |
Pre-bid Conference scheduled 02/10/10 @ 10:00 AM. Pump Maintenance.
|
*
|
5:00 PM
|
P10-0038 Water & Wastewater Site Pump Maintenance
|
Peoria
|
AZ |
|
Friday, February 19, 2010
|
There will be no pre-bid meeting for this project. The project consists of construction of sanitary sewers, including but not limited to
|
*
|
11:00 AM
|
SS2670DS Wastewater System Expansion Tarpon Downstream Sewer
|
Lake Havasu City
|
AZ |
On Site meeting for Custom Evaporative Coolers.
|
*
|
2:00 PM
|
DC100224 Custom Evaporative Coolers
|
Florence
|
AZ |
The Owner is seeking a supplier/installer to furnish and install one new rolling gate with card access and pedestrian gates to maintain existing egress requirements at the Convention Center North Building. A pre-bid conference will be held on Wednesday February 10, 2010 at 1:30 PM.
|
*
|
2:00 PM
|
Fabricate and Install New Sliding Security Gate IFB 10-104
|
Phoenix
|
AZ |
Contractor shall provide all labor, material, equipment, and transportation to install brick pavers, repair sprinkler and bubbler lines, repair or replace sprinkler heads, repair or replace sprinkler valves, replace valve boxes, plant and maintain twenty (20) - 36” box trees, fifty (50) - 5 gallon shrubs, sod, extruded curbing and stabilize granite in specified areas according to owner specifications. A pre bid conference will be held on February 10, 2010 at 10:00 AM.
|
*
|
2:00 PM
|
Landscape Project at A.L. Krohn Homes IFB 10-112
|
Phoenix
|
AZ |
The District is requesting proposals to design and furnish construction administration services for the New Vail High School (“Project"). This proposal shall include architectural services required to produce schematic) design development and construction drawings, specifications and details as required to obtain necessary building permits and provide all necessary information for bidding and construction of the Project.
|
*
|
2:00 PM
|
Professional Architectural Services RFP C10-01-11
|
Vail
|
AZ |
Improvements, including engineering.
|
|
2:00 PM
|
PW-1015 LONDON SQUARE II LOTS 9-50
|
Sierra Vista
|
AZ |
The project is to construct of a 33,570 sqft, 2-story federal office building, a 6,000 sqft warhouse, site infrastucture, and site development.
|
*
*
*
|
4:00 PM
|
L09PS01450 BLM Farmington Field Office
|
Farmington
|
NM |
|
Monday, February 22, 2010
|
A pre bid conference will be held at 9:00 a.m.
local Tucson time, February 4, 2010. This project includes asphaltic concrete milling, sawcutting, taxiway centerline light fixture adjustments, asphaltic concrete paving, paint striping, sealcoating and appurtenances.
|
*
*
|
2:00 PM
|
10109074 Reconstruction of Taxiway A13
|
Tucson
|
AZ |
The Owner is soliciting Bids from interested vendors to Drill a Well at the V Bar V Ranch in Rimrock, AZ. A non-mandatory pre-Bid conference will be held February 9th, 2010 at 9:00 AM. at the site.
|
*
|
2:00 PM
|
Request for Bids for Drilling a Well at the V Bar V Ranch S051029
|
Rimrock
|
AZ |
|
Tuesday, February 23, 2010
|
Notice is hereby given that the Owner will receive sealed proposals for RFP 09-44 ARCHITECTURAL/ENGINEERING SERVICES.
|
*
|
10:00 AM
|
Architechtural-Engineering Services RFP 90-44
|
Peoria
|
AZ |
A pre-bid meeting will be held on February 11th, 2010 at 1:30 PM. Sealed bids will be received by the Owner for construction of Bloom Elementary School Upgrades and Renovation.
|
*
*
|
1:00 PM
|
BLOOM ELEMENTARY School Upgrades and Renovation #10-87-10
|
Tucson
|
AZ |
There will be a pre-bid meeting at 10:00 a.m., Tuesday, February 9, 2010. Work shall include selective demolition, concrete foundations, drainage work, adobe and plaster repair and replacement, roof repairs, site ...
|
*
*
|
2:00 PM
|
1001170 Conservation Park-RAÚL M. GRIJALVA--CANOA RANCH CONSERVATION PARK
|
Santa Cruz River Valley south of Tucson
|
AZ |
Bridge Deck Rehabilitations (ARRA) work will include Bridge Deck Preparation; Methacrylate Treatment; Bridge Deck Repair; Methacrylate; Polyester Concrete Overlay; and various other miscellaneous items. A pre-bid conference for this project will be held on Friday, January 29th, 2010 at 2:00 p.m. Local Time.
|
*
|
2:00 PM
|
Bridge Deck Rehabilitations ARRA ST85110079-1010
|
Phoenix
|
AZ |
A pre-bid conference for this project will be held on Tuesday February 9, 2010, AT 10:00 AM, Local Time. Scope of work: The Corona Service Center will be a new facility consisting of a 5,000 square foot building, parking for employees, equipment, and service vehicles, a 10’ tall masonry security wall along the perimeter of the site including security gate access. In addition, there will be a variety of other structures within the site, including a wash rack high pressure water cleaning wand with 3-part oil separator for wastewater, a Vaccon dump basin and wash off area, cast-in-place concrete material storage bins, and covered storage racks for pipe, valves, and other such items typically included in a water maintenance/operation yard.
|
*
*
|
2:00 PM
|
Corona Service Yard WS85450010-1010
|
|
AZ |
The Owner has issued an Invitation for Bid (IFB) for Contract Number FCD 2009C025, East Mesa Drain No.4 – Channel Improvements. The major project construction components include channel excavation, concrete channel lining, and aggregate base course. The existing earthen channel and an adjacent access area lie within a 60 foot wide by approximately 800 foot long drainage Right-of-Way. A Pre-Bid conference is being held on Tuesday, February 9, 2010 at 11:00 A.M.
|
*
*
|
2:00 PM
|
East Mesa Drain #4 – Channel Improvements FCD 2009C025,
|
Phoenix
|
AZ |
A pre-bid conference for this project will be held on Tuesday February 9, 2010, at 11:00 AM, Local Time. A tour of the Site will be held immediately following the meeting. Scope of work: Rehabilitation of the reservoir consisting of removal and replacement of existing built-up roofing system, installation of a new reservoir liner, repairs to existing concrete structural members and metal connectors, ventilation improvements, installation of stairway to reservoir roof, minor electrical improvements including installation of back-up power to existing reservoir mixing system and transmittal of signals from existing mixer control panel, level sensor, and hatch intrusion alarm to existing RTU, and site improvements including paving of existing gravel access road, grading and drainage improvements, and removal of vegetation.
|
*
*
|
2:00 PM
|
Reservoir Roof Rehabilitation and Miscellaneous Repairs WS85050019-1010
|
|
AZ |
No pre-bid meeting for this project. The project consists of construction of sanitary sewers, including but not limited to furnishings and installation of manholes, sewers, sewer laterals and connection of individual houses.
|
*
|
2:00 PM
|
SS2680 Wastewater System Expansion
|
Lake Havasu City
|
AZ |
The Owner is accepting statements of qualifications from qualified engineering firms for professional services consisting of the planning and preliminary design of improvements to the Arizona State Trust Land referred to as Crossroads East located north and south of the SR101L, between Scottsdale and Pima Roads.
|
*
|
3:00 PM
|
Crossroads East Drainage Improvements
|
Scottsdale
|
AZ |
|
Wednesday, February 24, 2010
|
|
*
*
|
1:00 PM
|
National Park Service Interagency Communication Center
|
Boulder City
|
NV |
Pre-bid meeting on Tuesday, February 9, 2010 at 2:00 P.M. Local Tucson Time. Replace damaged existing 5/8" plywood deck with new 5/8" plywood deck.
|
*
|
2:00 PM
|
1001208 Roof Replacement at Quincie Douglas Library
|
Tucson
|
AZ |
A MANDATORY pre-bid conference will be held on Thursday, January 28, 2010 at 1:30 p.m. The Owner is extending an invitation for bids for Project No. R-2006B Deuce of Clubs Streetscape. The base bid includes, but is not necessarily limited to, the supply of all labor, material, equipment, and other resources to complete the installation of; curb and gutter, sidewalk, driveway aprons, traffic control and signage, walls, ramps, steps, rails, underground electrical conduit, electrical pull boxes, irrigation sleeves and lateral lines, and required demolition and removal on the south side of the Deuce of Clubs approximately 2,550 linear feet. Bid Alternate 1 includes the same work listed above but on the North side of the Deuce of Clubs. Bid Alternates 2 and 3 include all labor, material, equipment, and other resources to complete the installation of; light fixtures and poles, pole bases, lamps, wire, electrical meters, panels, electrical controls, trees and initial tree maintenance, irrigation water services, irrigation meters, controllers, remote control valves, mainline pipes, sprinkler heads and emitters, other irrigation equipment, on the south (Bid Alternate 2) and north (Bid Alternate 3) sides of the Deuce of Clubs.
|
*
*
|
2:00 PM
|
Deuce of Clubs Streetscape Project R-2006B,
|
Show Low
|
AZ |
The Owner (GSA) plans to reconfigure and expand the existing Port of Entry (LPOE).
|
*
*
|
3:00 PM
|
GS-09P-10-KTC-0005 'RECOVERY' Reconfiguration and Expansion Phases 2-4
|
Nogales
|
AZ |
|
*
*
|
4:00 PM
|
HRMC - Midwest Internal Medicine - Suites A, B & C
|
Lake Havasu
|
AZ |
|
Thursday, February 25, 2010
|
NOTICE IS HEREBY GIVEN that sealed bids will be received by the Owner for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Construct approximately 3 miles of new 4x2-inch traffic signal quad-duct, complete with splice boxes and branch conduits. Furnish and install new 144-strand single mode fiber-optic (SMFO) backbone cable, 12-strand SMFO branch cables, fiber-optic splice closures, fiber terminations, video detection camera systems, CCTV cameras, upgrade traffic signal control equipment, and all appurtenant work at 16 signalized intersections located in downtown Mesa, all as indicated on the Approved Plans and Specifications.
|
*
*
|
1:00 PM
|
ITS Signal Conversions Phase - 3 PROJECT NO. 06-057-001
|
Mesa
|
AZ |
ARTERIAL RECONSTRUCTION PROJECT UNIVERSITY DRIVE - VAL VISTA DRIVE TO GREENFIELD ROAD BROWN ROAD - RECKER ROAD TO POWER ROAD. NOTICE IS HEREBY GIVEN that sealed bids will be received by the Owner for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Remove approximately 81,500 SY of asphalt paving, scarify and re-compact aggregate base course, and install new 81,500 SY asphalt paving consisting of 2.5 inches of AC surface course over 3 inches of AC base course. Remove and replace approximately 9,600 SF of concrete, 800 LF of curb and gutter. Furnish and install sidewalk ramps, survey monuments, valley gutters, and pavement striping per plan. Additional items of work as necessary to complete the project in accordance with the Approved Plans and Specifications.
|
|
1:30 PM
|
PROJECT NO. 44-004-001 Arterial Reconstruction Project
|
Mesa
|
AZ |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $360,000
Engineer: Eric Hethcoat,Latimer Sommers & Associates
785-233-3232
ehethcoat@lsapa.com
|
*
*
*
|
2:00 PM
|
A-010945 Decentralization of Facility Heating-Phase 1
|
Winfield
|
KS |
Notice is hereby given the Owner is inviting statements of qualifications from licensed general contractors for construction manager at risk construction services for Civano Community Schools ("Project").
|
*
|
2:00 PM
|
CONSTRUCTION MANAGER AT RISK SERVICES RFQ # C10-03-12
|
Tucson
|
AZ |
Pre-bid Meeting is scheduled on February 11, 2010, 3:00 PM Local Tucson Time. This project scope of work includes construction of approximately 1.7 miles.
|
*
*
|
2:30 PM
|
1001252 CDO Linear Park
|
Tucson
|
AZ |
A pre-bid conference will be held on February 9, 2010, at 1:30 p.m. Sealed bids will be received by the Owner for furnishing all plant, material, equipment and labor, and to complete construction of: PROJECT NO 091018 Cholla Water Treatment Plant Miscellaneous Improvements. The project consists of the following improvements at the Cholla water Treatment Plant: Repair of hypalon liner at Cholla 1 Reservoir, Installation of a new VFD at Zone IB Booster Pump Station, Installation of new pump control valves at Zone 2 Booster Pump, and odor control improvements with new ductwork at Solids Handling Facility.
|
*
*
|
2:30 PM
|
Cholla Water Treatment Plant Miscellaneous Improvements PROJECT 091018
|
|
AZ |
ARTERIAL STREET OVERLAYS HARRIS DRIVE FROM SOUTHERN AVENUE TO 8th AVENUE, HIGLEY ROAD FROM US60 TO SOUTHERN AVENUE. NOTICE IS HEREBY GIVEN that sealed bids will be received by the Owner for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Remove approximately 8,100 SY of asphalt paving, scarify and re-compact aggregate base course, and install new asphalt paving consisting of 1.5 inches of rubber AC surface course over 4 inches of AC (A-3/4”) base course. Uniform mill approximately 36,100 SY of existing AC pavement and overlay with 1.5 inches of new rubber AC pavement. Provide tapered mill of approximately 18,800 SY of existing AC pavement and overlay with 1.5 inches of new rubber AC pavement. Remove and replace approximately 5,000 SF of concrete. Furnish and install sidewalk ramps, survey monuments, valley gutters, sidewalk, curb and gutter, and pavement stripping per plan. Additional items of work as necessary to complete the project in accordance with the Approved Plans and Specifications.
|
|
2:30 PM
|
PROJECT NO. 44--002-001 Arterial Street Overlays
|
Mesa
|
AZ |
ARTERIAL STREET RECONSTRUCTION ALMA SCHOOL ROAD FROM SOUTHERN AVENUE TO BASELINE ROAD, POWER ROAD FROM BROADWAY ROAD TO BASELINE ROAD. NOTICE IS HEREBY GIVEN that sealed bids will be received by the Owner for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Remove approximately 110,000 SY of asphalt paving, re-shape and re-compact aggregate base course, and install new asphalt paving consisting of 2.5-inches of AC surface course over 3-inches of base course. Mill approximately 55,000 SY of existing AC pavement and overlay with new AC pavement. Remove and replace approximately 5,300 SF of concrete. Furnish and install sidewalk ramps, survey monuments, and pavement striping per plan, and additional items of work as necessary to complete the project in accordance with the Approved Plans and Specifications.
|
|
3:30 PM
|
PROJECT NO. 44-005-001 Arterial Street Reconstruction
|
Mesa
|
AZ |
|
Friday, February 26, 2010
|
The work consists of up-grading storm water pump stations by constructing various improvements.
ADOT will only accept bids from prequalified contractors purchasing bid documents directly from ADOT.
|
*
|
11:00 AM
|
H726301C RESTORATION/REHAB/RESURFACE
|
Phoenix Urbanized Area
|
AZ |
The proposed work consists of removing and replacing the existing bridge deck...
ADOT will only accept bids from prequalified contractors purchasing bid documents directly from ADOT.
|
*
|
11:00 AM
|
H733001C MAJOR BRIDGE REHABILITATION
|
approximately 30 miles
|
AZ |
The Owner is seeking five qualified consulting engineering teams to provide design, construction plans, cost estimating, and possible post-design services for segment of Avenida Rio Salado/Broadway Road (ARS) from 7th Street to 51st Avenue. This is a federal aid project and will be coordinated with the Arizona Department of Transportation (ADOT) Local Government Section and the Federal Highway Administration (FHWA). A pre-submittal conference for this project will be held on Tuesday, February 9, 2010, at 10:30 a.m.
|
*
|
12:00 PM
|
Avenida Rio Salado/Broadway Road Design Services ST85100334-1010
|
Phoenix
|
AZ |
|
Monday, March 1, 2010
|
A pre-proposal conference will be held at 10:00 AM, Pacific Time, on 9 February 2010.
General Contractor will accept bids for; The intention of this design-build solicitation is to obtain all services, labor, materials, and equipment necessary for construction of a multi story,...
|
*
|
1:00 PM
|
P-600 Operational Support Center (NOSC)
|
Phoenix
|
AZ |
A pre-submission conference for the project will be held on Tuesday, February 16, 2010 at 10:00 a.m. local Tucson time. Potential construction services as the Construction Manager at Risk (“CMAR”).
|
*
|
2:00 PM
|
rfq 10108949 Reconstruction of Runway 3/2 and 10108950
|
Tucson
|
AZ |
|
Tuesday, March 2, 2010
|
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $450,000
Architect: Frank Burnam, PA
785-291-3989
Frank.Burnam@da.ks.gov
|
*
*
*
|
2:00 PM
|
A-011225 Sublette Subarea Renovation
|
Sublette
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
$200,000
Architect: Clark Simpson, PBA Architects
316-262-7400
clarks@pbawichita.com
|
*
*
*
|
2:00 PM
|
A-011268(a) Yates Hall Renovation Window Replacement
|
Pittsburg
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget:$120,500
Architect: Clark Simpson, PBA Architects
316-262-7400
clarks@pbawichita.com
|
*
*
*
|
2:00 PM
|
A-011268(B) Yates Hall Renovation - New Roof
|
Pittsburg
|
KS |
A pre-bid conference for this project will be held on TUESDAY, FEBRUARY 16, 2010 at 9:00 am. The project includes the expansion of the current communication fiber backbone network by installing new fiber optic equipment in existing ADOT conduit and infrastructure.
|
*
*
|
2:00 PM
|
Communication Fiber Backbone Expansion (ARRA)
|
|
AZ |
A pre-bid/site visit conference will be held at 10:00 am (AZ Time), February 17, 2010. Repairs to the Existing Advanced Wastewater Treatment Plant.
|
*
*
|
2:00 PM
|
M10-0007 Repairs to Existing
|
Marana
|
AZ |
The Owner is accepting sealed Bids for: DSSC COOLING TOWER REPLACEMENT, PROJECT #100021. Work will consist of the replacement of two cooling tower with associated piping and electrical connections. Each bid shall be in accordance with the specifications.
|
|
2:30 PM
|
COOLING TOWER REPLACEMENT IFB 2971-7
|
Tempe
|
AZ |
There will be a Pre-Bid Conference at 9:00 a.m. local Arizona time. Sealed bids will be received by the Owner for Solicitation HO0-910-2839 HVAC Service, Repair & Maintenance – Public Housing.
|
*
|
3:00 PM
|
HVAC Service & Repair Bid 9-333
|
Chandler
|
AZ |
The Owner is accepting sealed proposals for:
CONTRUCTION MANAGER AT RISK FOR THE FOR THE ESTRELLA HALL EXPANSION AND REMODEL AT ESTRELLA MOUNTAIN COMMUNITY COLLEGE. Services to be performed: Construction of a new addition to Estrella Hall approximately 43,000 square feet along with the remodeling of approximately 15,000 square feet within the existing building. A pre-proposal meeting will be held for all interested construction managers at 9:00 A.M., on Thursday, February 11, 2010.
|
*
|
3:30 PM
|
CMAR / ESTRELLA HALL EXPANSION AND REMODEL RFP 2954-7
|
Avondale
|
AZ |
|
Wednesday, March 3, 2010
|
A pre bid conference will be held at 9:00 a.m. Local Tucson Time, February 12, 2010. The project includes asphaltic concrete paving removal by milling and hauling to stockpile area, regrading and compaction of existing aggregate...
|
*
*
|
2:00 PM
|
20108847 DESIGN BID BUILD
|
Tucson
|
AZ |
A Pre-Bid Conference will be held at 9:00 A.M., Local Time, February 17, 2010. Pavement Preservation (Dynamite Blvd, Frank Lloyd Way (FLW) Blvd, Scottsdale Road South of FLW Blvd, Scottsdale Road - North of Camelback Rd, Hayden Rd - North of Chaparral Rd, Hayden Road - North of Thomas Rd, Thomas Rd - East of Hayden Road)
|
*
*
|
2:00 PM
|
PAVEMENT PRESERVATION 10PB059
|
Scottsdale
|
AZ |
The Owner is seeking proposals for the rehabilitation and/or development of all or part of city-owned residential property. The site consists of five historic residential structures. An informational meeting will be held on Monday, December 14, 2009 at 3:00 p.m.
|
*
|
2:00 PM
|
REHABILITATION OF HISTORIC RESIDENTIAL STRUCTURES AND REDEVELOP VACANT PROPERTY RFP HRSRFP0001-1010
|
Phoenix
|
AZ |
It is the intent of the Owner to select a Contractor for the East Fire Lane to Baseball Field and Sidewalk at Scottsdale Community College. Work will consist of the addition of sidewalk between east fire lane and baseball field, as well as seating areas, sidewalk north of Batting Cages, and other site improvements.
|
|
3:30 PM
|
EAST FIRELANE TO BASBALL FIELD AND SIDEWALK ADDITION IFB 2969-7
|
Scottsdale
|
AZ |
|
Thursday, March 4, 2010
|
A Pre-Bid Conference will be held at the District Office on February 18, 2010, at 1:00 p.m. Project consists of the installation of approximately 1,314 LF 12" SDR 35 PVC gravity sewer pipe, ...
|
*
*
|
1:00 PM
|
Hilltop North Sewer Line Extension 10-1
|
Lakeside
|
AZ |
Pre-bid meeting is scheduled for February 18, 2010 at 3:00 P.M. The project consists of installing of 2" AC overlay on existing AC
|
*
|
2:00 PM
|
1000787 ARRA PAVEMENT PRESERVATION OVERLAYS
|
Township 13 South, Range 12
|
AZ |
A pre-bid conference will be held at 9:00 a.m. Local Tucson Time, February 12, 2010. The project has three additive bid alternates.
|
*
*
|
2:00 PM
|
20100390 Runway & Taxiway Lighting
|
Tucson
|
AZ |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $525,000
Engineer: Kelly Conway, Brack & Associates Consulting Engineers
785-271-6644
|
*
*
*
|
2:00 PM
|
A-010860(B) Willard Hall Infrastructure Renovations - Phase 2 Fire Alarm Upgrades
|
Manhattan
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $150,000
Engineer: William Bassette, Latimer Sommers & Associates
785-233-3232
Wbassette@lsapa.com
|
*
*
*
|
2:00 PM
|
A-011184 Administration; Lawrence Gardner High School Add Fire Alarm System
|
Topeka
|
KS |
The Owner is seeking qualified General Commercial Contractors (Arizona State Registrar of Contractors B-01 License) to perform miscellaneous construction services, including limited pre-construction design services (i.e. professional services), for various projects to be determined such as repairs, additions, renovations & remodeling at the various Parks utilizing Job Order Contracting (JOC) project delivery methods. A pre-submittal meeting will be conducted on Thursday, February 18, 2010 at 9:30 am.
|
*
|
2:00 PM
|
GENERAL COMMERCIAL CONTRACTORS JOC Project HQ 10-003
|
|
AZ |
The Owner is accepting sealed bids to furnish all labor, materials, and equipment for: TAHOE PARKING LOT PROJECT #100001. Work consists of constructing a new paved parking lot approximately 275 parking spaces, including grading, curbs, light poles, irrigation sleeve, retention and related site work. Each bid shall be in accordance with the specifications. There will be Pre-Bid meeting held at 11:00 A.M. (MST), Wednesday, February 17, 2010.
|
|
2:00 PM
|
TAHOE PARKING LOT IFB 2972-7
|
Mesa
|
AZ |
A pre-bid conference will be held at 9:00 a.m. Local Tucson Time, February 12, 2010.
This project includes, but is not limited to, installation of the concrete pads, appurtenances,...
|
*
*
|
3:00 PM
|
20106625 Runway Lighting & 20106606 Install Electrical Vault
|
Tucson
|
AZ |
|
Tuesday, March 9, 2010
|
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $649,205
Architect: Kevin Morgan, KDOC
785-296-4489
kevinm@doc.ks.gov
|
*
*
*
|
2:00 PM
|
A-011333 El Dorado Correctional Facility Commons Building Partial TPO Reroof
|
El Dorado
|
KS |
|
Wednesday, March 10, 2010
|
A Pre-Bid Conference has been scheduled for February 24, 2010 at 10:00 a.m. The project consists of the excavation of final cover soils from a ....
|
*
*
|
1:00 PM
|
S2010-001Landfill Final Cover Placement
|
Queen Creek
|
AZ |
|
Thursday, March 11, 2010
|
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
Budget: $332,000
Architect: Troy Steiner, Fort Hays State University
785-628-4437
tjsteiner@fhsu.edu
|
*
*
*
|
2:00 PM
|
A-011339 Agnew Hall Raze Building
|
Hays
|
KS |
|
Wednesday, March 17, 2010
|
Tours will start at 9:00 A.M. at the construction site on Wednesday, February 17, 2010 and Wednesday, March 3, 2010. Project consists of construction of a bridge mounted pump structure, and more as listed...
|
*
|
10:00 AM
|
C 0559 South Recharge Phase 1
|
|
AZ |
|
Tuesday, March 23, 2010
|
There will be a pre-bid meeting on February 24, 2010 at 10:30 a.m. The scope for this Phase 3 includes installation of 2,000± LF of new 42-64" and 6,000± LF of new 66" diameter pipe using mostly...
|
*
*
|
2:00 PM
|
1000295 Santa Cruz Interceptor Phase 3
|
Tucson
|
AZ |
|
Friday, March 26, 2010
|
This project includes two separate Pre-Engineered Metal Buildings (PEMB) on the same site: a single story Administration Building of 12,000 square feet and a two story Facilities and Sign Shop Building of 13,250 square feet. Scope of work includes engineering and design of PEMB as described in the specifications and drawings, interior partitions, ceilings, floor finishes, mechanical, plumbing, and electrical building systems. Utilities are limited to inside of building and five feet outside of perimeter. No landscape or hard-scape.
|
*
*
|
11:00 AM
|
Gila County Public Works Bid No. 110109-1
|
AZ
|
AZ |
There is a mandatory site walk through scheduled for Thursday, February 25, at 12:30 p.m. local time. Sealed bids will be received by the Owner for the PUBLIC WORKS COMPLEX ROADS/SHOP BUILDING, BID NO. 110309-1.
|
|
11:00 AM
|
PUBLIC WORKS COMPLEX ROADS/SHOP BUILDING PROJECT 110309-1
|
Globe
|
AZ |
Sealed bids will be received by the Owner for BID NO. 110109-1, COUNTY FACILITIES AND SIGN SHOP. The Architect will hold a Pre-Bid Conference at the site, at 10:00 a.m. local time on Thursday, February 25, 2010. Attendance at this Conference by prospective Bidders is mandatory.
|
|
11:30 AM
|
COUNTY FACILITIES AND SIGN SHOP BID 110109-1
|
Globe
|
AZ |
|
Thursday, April 1, 2010
|
Presolicitation, intension is to issue a solicitation with a requirement to Repair the Building Exterior.
|
*
|
1:00 PM
|
P0610JPF10001REPAIR BUILDING EXTERIOR
|
SAN DIEGO
|
CA |
This acquisition is an unrestricted Best Value Request for Proposal (RFP), open to both large and small business concerns. WORK CONSISTS of building a new Air Aviation Support Facility (AASF) and Aircraft Rescue and Firefighting Facility (ARFF) of permanent type construction. Documents will be issued on or about February 11th, 2010.
|
|
2:00 PM
|
NEW MEXICO ARMY NATIONAL GUARD ARMY AVIATION SUPPORT FACILITY W912PP-10-R-0014
|
Santa Fe
|
NM |